VST interiors were contracted to complete the external metal structural framing system with cement board sheathing.
In addition, VST installed metal stud partitions and ceilings throughout the building with a tape and jointed finish. VST worked with the developer to manage deliveries as there was no exterior space surrounding the development.
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15-2.jpg)
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15-3.jpg)
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15-4.jpg)
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15-5.jpg)
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15-6.jpg)
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15-7.jpg)
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15-8.jpg)
![](https://vst-interiors.co.uk/wp-content/uploads/2023/02/PHOTO-2023-01-16-10-31-15.jpg)